MESCOM
|SRTPV
NEW APPLICATION
GUIDELINES
For Consumers
For Officers
APPLICATION STATUS
UPLOAD DOCUMENTS
X
ENTER THE APPLICATION DETAILS
Application ID
*
Mobile Number
*
Application Form for Grid Connectivity Solar Roof Top PV Generation System on Gross/Net Metering Basis
Category Type
*
Choose Category Type
Domestic/Residential
Hospital
Educational Institution
Industrial
Commercial
Other than the above
Applicant Name
*
Applicant Address
*
RR Number
*
Account ID
Sanctioned Load/Contract Demand(kW)
*
Applicant Mobile Number
*
Applicant Email ID
Sub-Division Office
*
Select SubDivision
AJJAMPURA SUBDIVISION
ALDUR SUBDIVISION
ANAVATTI SUBDIVISION
ATTAVARA SUBDIVISION
BALEHONNUR SUBDIVISION
BANTWAL SUBDIVISION-1
BANTWAL SUBDIVISION-2
BEJJUVALLI SUBDIVISION
BELTHANGADY SUBDIVISION
BHADRAVATHI CITY SUBDIVISION
BHADRAVATHI RURAL SUBDIVISION
BIRUR SUBDIVISION
BRAHMAVARA SUBDIVISION
BYKAMPADY SUBDIVISION
BYNDOOR SUBDIVISION
CHIKKAMAGALURU RURAL SUBDIVISION
CHIKKAMAGALURU URBAN SUBDIVISION
HEBRI SUBDIVISION
HOLEHONNUR SUBDIVISION
HOSANAGARA SUBDIVISION
JOG SUBDIVISION
KAAPU SUBDIVISION
KADABA SUBDIVISION
KADUR SUBDIVISION
KAIKAMBA SUBDIVISION
KALASA SUBDIVISION
KARKALA SUBDIVISION
KAVOOR SUBDIVISION
KOPPA SUBDIVISION
KOTA SUBDIVISION
KULASHEKARA SUBDIVISION
KUMSI SUBDIVISION
KUNDAPURA SUBDIVISION
MANIPAL SUBDIVISION
MANNAGUDDA SUBDIVISION
MOODABIDRI SUBDIVISION
MOODIGERE SUBDIVISION
MULKY SUBDIVISION
NITTE SUBDIVISION
PUTTUR CITY SUBDIVISION
PUTTUR RURAL SUBDIVISION
SAGARA CITY SUBDIVISION
SAGARA RURAL SUBDIVISION
SHANKARANARAYANA SUBDIVISION
SHIKARIPURA SUBDIVISION
SHIRALAKOPPA SUBDIVISION
SHIVAMOGGA CITY SUBDIVISION-1
SHIVAMOGGA CITY SUBDIVISION-2
SHIVAMOGGA CITY SUBDIVISION-3
SHIVAMOGGA RURAL SUBDIVISION
SORABA SUBDIVISION
SRINGERI SUBDIVISION
SUBRAHMANYA SUBDIVISION
SULLIA SUBDIVISION
SURATHKAL SUBDIVISION
TARIKERE SUBDIVISION
THALLUR SUBDIVISION
THIRTHAHALLI SUBDIVISION
UDUPI URBAN SUBDIVISION
UJIRE SUBDIVISION
ULLAL SUBDIVISION
VITLA SUBDIVISION
Type Of Installation
*
Select Type Of Installation
Single phase LT / (Up to and inclusive 5kWp)
Three phase LT / (Up to 50kWp)
HT (above 50kWp up to 500kWp)
Select Type Of Metering
*
Select Type Of Metering
Net Metering
Gross Metering
Approximate Shadow free Area(in Sq.Mtrs)
Proposed Capacity of SRTPV plant in kW peak
*
MNRE Subsidy Sanctioned?
*
Select
Yes
No
Wish to avail MNRE Subsidy?
*
Select
Yes
No
Upload Subsidy Sanction Document
Submit
Applicaiton Submitted Successfully -
* Special Characters not allowed
×
Sorry ...!!! You are not authorized to access this submodule...!
JSP Page